What are the sizes of the proposed buildings?
Building
number |
No.
of floors |
GEFA
sq m |
GEFA
sq ft |
Floor
plate range sq ft |
B1
Offices |
26 |
29,887 |
321,704 |
8k – 14k |
B2
Residential |
27 |
17,430 |
187,617 |
|
B3
Offices |
15–18 |
31,970 |
344,125 |
11k – 18.5k |
B5
Offices |
14 |
18,722 |
201,524 |
13k |
B7
Residential |
21 |
15,965 |
171,847 |
|
B4
Residential |
11 |
10,085 |
108,555 |
|
B8
Residential |
8 |
13,105 |
141,062 |
|
B6
(Cultural) |
3 |
2,000 |
21,528 |
|
Bowling
Alley |
2 |
2,030 |
21,851 |
|
Retail – Ground |
1 |
8,157 |
87,802 |
|
Retail – Lower |
1 |
6,750 |
72,657 |
|
Retail – Mezz. |
1 |
4,000 |
43,056 |
|
Total |
|
160,101 |
1,723,327 |
|
Who will occupy the offices and shop units?
The offices and shops will be built on a speculative
and phased basis. The offices will be designed to offer
maximum flexibility to allow for the needs of both smaller
and larger occupiers. The same applies to the shop units,
restaurants and cafes.
The shop units will be designed
to cater for a mix of operators who will support the
other uses on the site and offer a high quality retailing
experience which will not rival or duplicate what the
town has to offer elsewhere.
Isn’t
there a surplus of flats in central Reading?
There is currently a modest over supply of flats in
the town centre but we believe this will be taken up.
There is pent-up demand for residential accommodation,
which is currently being suppressed by the lack of mortgage
credit. The 1st phase of this development will not be
available until 2014.
Where will the existing car parking spaces
go?
The existing car park will be removed as part of the
redevelopment and be replaced with new parking provision
within the site, probably 2 levels under the retail and
public realm levels providing around 320 spaces. New
parking provision will be shared between the occupiers.
Will the redevelopment affect the bus services
on Station Hill?
The Station Hill development is being designed to be
compatible with Reading Borough Council’s and Network
Rail’s proposals for the Station and Station Hill.
This will involve a reorganisation of the bus interchange
resulting in greater flexibility. More details can be
obtained from Reading Borough Council.
Is the redevelopment of the Station Hill
site linked to the improvements to the railway station?
The Station Hill development can stand separate from
the new Station entrance, but both Sackville and Reading
Borough Council are keen that there is an interface between
the projects. As the Station Hill development is proposed
on two levels, this can provide level access to the Station
at both the current level and the lower subway level.
Will there be 24-hour access through the
new development?
There will be 24-hour access through the principle public
routes through the site.
Will the public have access to the upper
floors of the highest buildings?
Provision will be made for public access to a viewing
gallery offering views of Reading, the River Thames,
and the surrounding countryside.
How long will the development take?
Redevelopment will take a considerable length of time
(possibly 6-8 years) due to the complexity of the site
and the demolition and preparatory works that are required
before new development can begin. We anticipate that
the site will be developed in 3 or 4 phases.
Why has it been necessary to have a second
application?
After submission of the previous planning application,
Sackville purchased the Friars Walk Shopping Centre.
This is included in this new scheme and it has allowed
for lower density, more generous public realm and much
improved connectivity to Friar Street and the town in
general.
Will this application be “called in”?
Reading Borough Council are not intending to refer the
application to the Government office because it is fully
compliant with both Regional and Local Planning Guidance.
The Town & Country Planning (Consultation) Direction
2009 further reduces the possibility of call-in because
the proposed development is both within the town centre
and in accordance with the development plan.
Are the developers making financial contributions
(Planning Gain/S106) to the council?
There is a substantial package which includes contributions
to the public transport system in the town, affordable
housing and training. The developers are also making
special provision with the inclusion of a Tenpin Bowling
facility and are also taking account of the new station
entrance.
Who is funding the project?
Funding is being provided by Sackville and its bankers.
It is anticipated that a suitable additional funding
partner will be brought in at the appropriate time. The
likely total cost is projected at c £400m.
Will the current financial uncertainties
delay the project?
Sackville is talking to investors
who take a long-term view of the market and would be
happy to talk to additional parties interested in the
scheme. Furthermore, projects of this type tend to go
live through economic cycles and this can be factored
into the viability. There is a significant shortage of
sustainable Grade A stock in Reading town centre and
the obsolescence of existing supply will create inherent
demand as the economy recovers over next two to three
years. The
scheme is also of regional significance, which will draw
interest from the wider area including London.
|